Japanese Page&nbsp Old Page

[Linac Subgroup] [Linac Information] [Accelerators] [Detectors] [KEK] [Linac]


200,000 hours of linac operation since 1982 (May.7.2020)

Simultaneous top-up injections into four storage rings (May.15.2019)

Fire at linac accelerator structure assembly room (Internal, Apr.3.2019)

SuperKEKB main ring injection from RF gun (May.31.2016)

Positron transferred to 2nd switch yard with 0.02nC/bunch (Jun.8,9.2014)

Positron transferred to 2nd switch yard with 0.01nC/bunch (Jun.7.2014)

First positron observed in the new capture section with flux concentrator (Jun.5.2014)

How's Linac Recovery Going (Mar.23.2011)
How's Linac Recovery Going (Mar.20.2011)
Linac Photos During and After Earthquake (Mar.11-17.2011)
Linac Video During Earthquake (Mar.11.2011)
    (mp4, 15MB, 18second-video + 1.5minute-voice, by K.Suzuki)

[Please comment on this page] <webmaster at mail-linac.kek.jp>, Linac, KEK, May.2.1994-May.22.2019

High Energy Accelerator Research Organization (KEK) KEK LogoDisclaimer and Copyright Notice of KEK Web Pages

[IUC]
[Linac Commissioning Group]
[Linac Control Group]
[Linac RF Group]
[Linac Operation Group]
[Slow Positron Facility]
[Experiment on Positron Production with Crystal]
[KEK New X-band Test Facility]
[User Pages]
[Linac Information]
[Operation Log]
[Operation Log (old)]
[Mail Archives]
[Linac Papers/Reports]
[Linac Technical Meeting (Internal Only)]
[Linac Seminar]
[Linac Computer Environments]
[Miscellaneous Pages]
[SuperKEKB]
[SuperKEKB(Ope)]
[PF Ring]
[J-PARC]
[ILC]
[STF]
gate io
[KEK Accelerators]
[Accel-J]
[SuperKEKB Belle II] [KEKB Belle]
[ATLAS]
[Linac Primary]
[Linac Secondary (Internal)]
[Linac Tretiary (Internal)]
[KEK]
[KEK-J]
[KEK-Comp/Net]
[KEK-lib]